Top 10 Long Lead Extension Cable UK – Extension Cords

As an Amazon Associate I earn from qualifying purchases.

1. Masterplug

#ad

White, 2 Metres, Masterplug Eight Socket Surge Protected Extension Lead, 27 x 10 cm

#ad
Masterplug #ad - All masterplug surge protector products have a safety thermal cut-out indicator: Letting you know that your connected appliances and electrical equipment is protected. Protect your electrical appliances from power surges and spikes: Switching on and off fluorescent lights and appliances such as refrigerators, washing machines and tumble dryers can cause power surges, which over time can seriously damage electronic equipment.

The eight socket extension lead has a 13 amp fuse with safety shuttered sockets: Eliminating the problem when the number of electrical items outnumber the amount of available sockets. Use efficiently around the home with wall fixing capability: Giving you the option to mount the 2-metre extension lead, measuring 27 x 10 cm onto the wall, if you are struggling with available ground space.

Masterplug is part of luceco plc: They guarantee against faulty materials and workmanship and comes with a £1000 connected equipment three year warranty. Do not use if the ‘surge production operational indicator’ is not illuminated.
BrandMasterplug #ad
ManufacturerMasterplug #ad
Height1.97
Length13.19
Weight0.84 kg (1.85 Pounds)
Width7.87
Part NumberSRG82-MS
ModelSRG82-MP

2. Masterplug

#ad

Masterplug SRGDSU62PB-MP Six Socket Switched Inline Power Surge Protected Extension Lead with Two USB Charging Ports, 2 Metres, Gloss Black, 6.2 cm*8.7 cm*20.6 cm

#ad
Masterplug #ad - Trust in the ‘smart’ usb features: which standby once your device has fully charged and it can also auto detect your USB device and adjust its charging pattern – making it suitable for iPhone and android appliances.

Use efficiently around the home with wall fixing capability: Giving you the option to mount the 2 m extension lead onto the wall, if you are struggling with available ground space. Masterplug is part of luceco plc: They guarantee against faulty materials and workmanship and comes with a £1000 connected equipment three year warranty. The six socket extension lead has a 13 amp fuse with safety shuttered sockets: Eliminating the problem when the number of electrical items outnumber the amount of available sockets.

Protect your electrical appliances from power surges and spikes: Switching on and off fluorescent lights and appliances such as refrigerators, washing machines and tumble dryers can cause power surges, which over time can seriously damage electronic equipment.
BrandMasterplug #ad
Manufacturermasterplug #ad
Height2.44
Length3.43
Weight1.1
Width8.11
Part NumberSRGDSU62PB-MP
ModelSRGDSU62PB

3. anhoyo

#ad

Wall Mounted, Anhoyo 4Way Extension Lead with Individual Switches, 13Amp Extension Cord Surge Protected Extension Cable 1.8M with Indicator Lights, UKCA/CE Listed, White4Way-1.8Meters

#ad
anhoyo #ad - Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection. The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire.

Rated for use with a maximum electrical of 13A/250V/3250W. Made by fire-resistant material, CE, certified by ATSA, RoHS. Mounting holes:designed with 2 mounting holes on the back for easy installation, it is perfect for nightstand, worktop, you can mount this USB power charging station with 2 screws to the wall easily, dresser, desktop. Fire-retardant material:heavy pvc coating, integrated copper wiring, and flame retardant casing to create an safe power source.

Fireproof shell can withstand temperatures up to 850°C, which maximizes safety performance. Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected. 6ft power extension:6feet/1. 8minclude plugs long extension cords.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Weight0.35 kg (0.77 Pounds)
Part NumberA-UK
ModelJN9
Warranty2Years Warranty

4. anhoyo

#ad

UKCA/CE Listed, White 4Way-3Meters, Anhoyo 4 Way Extension Lead with Individual Switches, 13Amp Extension Cord Surge Protected Extension Cable 3M with Indicator Lights, Wall Mounted

#ad
anhoyo #ad - Fire-retardant material:heavy pvc coating, and flame retardant casing to create an safe power source. Fireproof shell can withstand temperatures up to 850°C, integrated copper wiring, which maximizes safety performance.

Made by fire-resistant material, CE, certified by ATSA, RoHS.9. 84ft power extension:9. 84 feet/3minclude plugs long extension cords. The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire. Rated for use with a maximum electrical of 13A/250V/3250W. Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected.

Mounting holes:designed with 2 mounting holes on the back for easy installation, you can mount extension cord with 2 screws to the wall easily, worktop, it is perfect for nightstand, dresser, desktop. Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Weight1.3
Part NumberA-UK
Warranty2Years Warranty

5. anhoyo

#ad

Anhoyo 4Way Extension Lead with Individual Switches, 13Amp Extension Cord Surge Protected Extension Cable 5M with Indicator Lights, White4Way-5Meters, UKCA/CE Listed, Wall Mounted

#ad
anhoyo #ad - Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection. 16. 4ft power extension:16. 4feet/5minclude plugs long extension cords.

Mounting holes:designed with 2 mounting holes on the back for easy installation, worktop, you can mount this USB power charging station with 2 screws to the wall easily, dresser, it is perfect for nightstand, desktop. Fire-retardant material:heavy pvc coating, integrated copper wiring, and flame retardant casing to create an safe power source. Fireproof shell can withstand temperatures up to 850°C, which maximizes safety performance.

Made by fire-resistant material, CE, certified by ATSA, RoHS. The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire. Rated for use with a maximum electrical of 13A/250V/3250W. Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Part Number1
ModelASDF97
Warranty2Years Warranty

6. EMOS

#ad

Rubber Extension Cable for Outdoor Use, IP44, EMOS 10 m Schuko Extension Cable, H07RN-F3G 2.5 mm²

#ad
EMOS #ad - Robust 10 m extension cable for outdoor, garden, wet room, indoor or industrial use. Protection class: ip44, maximum load 3680 W, heat and cold resistant, 250 V / 16 A max. The schuko socket is equipped with a cap that protects the cable from foreign bodies and splashes of water. Perfect for permanent use outdoors or at the construction site - the high-quality rubber neoprene insulation masters all weather conditions. Cable type: h07rn-f3g 2. 5 mm², colour: black, increased touch protection.
BrandEMOS #ad
ManufacturerEMOS #ad
Length10
Weight3.2
Part NumberZY-EJ-LONG-77
ModelP01810R

7. Tecmate

#ad

OptiMate O13 SAE Extension Lead 4.6 Meter

#ad
Tecmate #ad - Extend your sae connection industry standard durability – Built to last! Includes weatherproof rubber seal for heavy duty SAE connector. Low temperature use -20°c/-4°F – Remains Flexible! Length 15ft/460cm.
BrandTecmate #ad
ManufacturerTecMate Group #ad
Height1.97
Length5.91
Weight0.15 kg (0.33 Pounds)
Width1.97
Part NumberO-13
ModelO-13
Warranty3 Year limited warranty

8. SAMERIVER

#ad

2M Extension Cable Power Strip for Home, Office, 8 Way Multi Plug Extension Tower with Surge Protection Extension Cord Switch 13A 3250W, Bedroom., Tower Extension Lead with 4 USB Slots

#ad
SAMERIVER #ad - Smart usb charging: tower extension lead has 4 usb portsmax output 3. 4a/17w in total. 12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time. You can turn off all electronic devices when not in use to save energy, In the event of a power overload, also, the red button at the bottom serves as an overload protection switch, it can also provide excellent protection for your electronic equipment.

Such as your computer, cellphone, MP3, tablet. Security tips: please check the power requirements of your appliances before use, the total power of the connected appliances is not allowed to exceed the rated power 3250W. 3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, ensure an all-round protection for you and your electronic devices. Multiple protection: a switch on the bottom of the plug extension tower controls the entire power supply.

Do not plug portable heaters, refrigerators or large lottery appliances into the switchboard, but plug them into a dedicated mains power outlet. With a tower design you can tidy your cable and gives your usb devices a safe faster speed charge! Create an organised and neat space. All-round protection: tower extension lead is certified by fcc and rohs etc, tower extension lead have passed the tests of authoritative testing institutions, and the products meet the safety requirements. Usb-c delivering 3.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
Height0.1 cm (0.04 Inches)
Length8.8 cm (3.46 Inches)
Width8.8 cm (3.46 Inches)
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects

9. SAMERIVER

#ad

8 Way Mini Tower Extension Lead with 4 USB Ports13A 3250W Multi Plug Extension Tower 2M Extension Cable Surge Protection Extension Lead for Home, Kitchen, Office, Tower Extension Lead with USB Slots

#ad
SAMERIVER #ad - 12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time. Do not plug portable heaters, refrigerators or large lottery appliances into the switchboard, but plug them into a dedicated mains power outlet.

Smart usb charging: tower extension lead has 4 usb portsmax output 3. 4a/17w in total. Usb-c delivering 3. 0a max, each uSB-A 2. 4a max with smart ic charging technology, will automatically identify the connecting devices and output optimal charging speed for your devices. Multiple protection: a switch on the bottom of the plug extension tower controls the entire power supply. 3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, tower extension lead have passed the tests of authoritative testing institutions, ensure an all-round protection for you and your electronic devices.

With a tower design you can tidy your cable and gives your usb devices a safe faster speed charge! Create an organised and neat space. Such as your computer, MP3, cellphone, tablet. Security tips: please check the power requirements of your appliances before use, the total power of the connected appliances is not allowed to exceed the rated power 3250W. We promise a worry-free 18-month warranty and 24 hours quick reply service.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects

10. SAMERIVER

#ad

Extension Lead with USB Slots, Sameriver 13A 3250W Mini Tower Extension Lead 3M with 8 AC Outlets & 4 USB Ports Multi Plug Extension Tower, Kitchen, Office, Black,3M Extension Cable for Home

#ad
SAMERIVER #ad - All-round protection: tower extension lead is certified by fcc and rohs etc, and the products meet the safety requirements. Such as your computer, MP3, cellphone, tablet.3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, tower extension lead have passed the tests of authoritative testing institutions, ensure an all-round protection for you and your electronic devices.

12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time. Usb-c delivering 3. 0a max, each uSB-A 2. 4a max with smart ic charging technology, will automatically identify the connecting devices and output optimal charging speed for your devices. Multiple protection: a switch on the bottom of the plug extension tower controls the entire power supply.

You can turn off all electronic devices when not in use to save energy, the red button at the bottom serves as an overload protection switch, In the event of a power overload, also, it can also provide excellent protection for your electronic equipment. Do not plug portable heaters, refrigerators or large lottery appliances into the switchboard, but plug them into a dedicated mains power outlet. We promise a worry-free 18-month warranty and 24 hours quick reply service. Smart usb charging: tower extension lead has 4 usb portsmax output 3. 4a/17w in total.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
Height0.04
Length3.46
Width3.46
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects